Lennox Ebony
Ships in 2-5 weeks
The Lennox Ebony features a sleek slim-shaker design in a deep, modern ebony finish. Its clean lines and smooth matte look create a bold, contemporary statement while still offering timeless appeal. Lennox Ebony pairs beautifully with Lennox Frost for a balanced two-tone kitchen, combining contrast and sophistication. Durable construction and a refined profile make it an excellent choice for anyone seeking a modern, elevated space.
Â
| Shipping Time: |
Ships in 2-5 weeks |
| Style: | Slim Shaker |
| Face Frame: | 3/4" solid hardwood |
| Door Frame: | Solid hardwood slim shaker frame |
| Door Center: |
Plywood center with HDF on either side |
| Sides: | 1/2" plywood |
| Top & Bottom (Wall): | 1/2" plywood |
| Bottom (Base): | 1/2" plywood |
| Back Panel: | 3/16" plywood skin on a 1/2" plywood frame |
| Shelves: | 1/2" or 3/4" plywood shelves with matching veneer and edge banded finish (1/2" for 30"W cabinets and under, 3/4" for 30"W and over), plastic shelf clips |
| Base Cabinet Shelf Depth: | 16" |
| Drawer Box: | 3/4" solid hardwood, 5-piece drawer front, 5/8" solid wood, dovetailed drawer box with 1/2" plywood drawer bottom, natural finish and sealed |
| Drawer Glides: | Heavy duty, soft-close, undermount drawer glides with 77 lbs weight capacity |
| Base Corner Supports: | 90 degree heavy duty metal corner brackets |
| Overlay: | Full |
| Hinges: | Concealed, 6-way adjustable hinges with 105 degree opening angle and 65 lb weight capacity |
| Cabinet Interior: | Matching |
| Center Stile: |
None |
| Assembly Method: | Nail/Screw/Staple/Glue |
| Finish: |
Acid-catalyzed paint, extremely durable and resistant |
| Toe Kick: | 1/2" plywood toe kick |
| Installation Rail: | 3"W, 1/2" installation rail on all cabinets, along all 4 sides. Wider cainets will also have another vertical rail in the middle. |
| Wall Cabinet Bottoms Finished (Exterior): | Yes (side panel bottom edges will be unfinished) |
| CARB Compliant: | Yes |
| Door Hinges: | Hinges will needed to be installed, pre-drilled on both sides |
| Toe Kicks Included w/Base Cabinets: | Yes *please note that 8' pieces of toe kick need to be purchased for cabinets side by side, to hide gaps* |
| Sides Panels Finished: | Matching |
| Installation/Designer Note: |
If installed directly against a wall or deeper cabinet/appliance, 1/4" space is recommended, scribe molding can be installed between the cabinet and the wall (or deeper cabinet), if needed. If not, the door may not be able to open a full 90 degrees. A larger space may be needed depending on the decorative hardware used on the cabinets. The cabinet depth measurement listed is the depth from the front of the face frame to the back of the cabinet, and does not include the cabinet door depth. Schematic images and renderings are generic and may not represent exact construction details for each collection. The exact specifications for this collection can be found in the construction details listed above. |

Login and Registration Form